the implementation of these ceilings is very simple. The implementation process consists of the following two steps.
Implementation of the
tiling network
To implement the network, tools such as meters and laser levels, nail guns and rechargeable drills are used.
First, you should check the strength of the main roof and see if it can withstand the incoming load or not.
If the answer to this question is positive, specify the height of the ceiling. If the height of your space is suitable, you can use this type of roof.
Using a laser level, the installation position of corners and shields is determined. Corners are used for walls and around columns. Shield 3.60 is considered the backbone of the network. This structure is directly connected to the main roof using hangers or wires.
Other shields are locked and clicked to this structure. They usually install a 3.60 shield along the length of the false ceiling.
When the work of building the network was completed. Tiles are placed in the grid. For this purpose, it is enough to place the tiles inside it from the diameter of the grids.